Welcome to Pipeline Expansion Joint Manufacturer- Shanghai Songjiang Group Website |    Call Now:++86 13032112360    sales@songjiangflex.com

Advancing Wastewater Infrastructure: Songjiang Pipeline Expansion Joints at Nanchang Jiulong Lake Treatment Plant

 Project Cases     |      2024-05-22

In the realm of wastewater infrastructure improvement, Songjiang Shock Absorber Co., Ltd. emerges as a reliable partner, offering innovative solutions for projects such as the Nanchang Jiulong Lake Wastewater Treatment Plant. This case study explores the integration of Songjiang Pipeline Expansion Joints at the treatment plant, showcasing their efficacy in contributing to the success of this vital environmental project.

Introduction to Nanchang Jiulong Lake Wastewater Treatment Plant:

The second-phase expansion project of Nanchang Jiulong Lake Wastewater Treatment Plant, initiated after the feasibility study report was made public in July of the previous year, has recently commenced construction. Approved by the Economic Development Information Bureau of Nanchang Honggutan New Area, the EPC total contract for the expansion is granted under document number Hongxin Jingfa [2018] 56. With an investment of approximately CNY 4.58 billion, the expansion aims to handle a total wastewater treatment capacity of 90,000 m3/d.

Innovative Features of Songjiang Pipeline Expansion Joints:

The success of this project is intertwined with the incorporation of Songjiang Pipeline Expansion Joints, a crucial component in the sewage discharge pipeline system. Designed to meet the specific requirements of the Nanchang Jiulong Lake Wastewater Treatment Plant, these expansion joints exhibit adaptability, corrosion resistance, and seamless integration into the treatment facility’s infrastructure.

Project Layout and Significance:

Situated in the new district of Nanchang, the expansion project employs a semi-underground sewage treatment facility, strategically positioned east of the initial phase. This unique design utilizes a half-submerged structure, with the upper section covered in soil for landscaping purposes. Key facilities, including grates, pumping stations, aeration sedimentation tanks, and various treatment units, contribute to the overall success of the project.

Integration and Environmental Considerations:

Songjiang Pipeline Expansion Joints play a vital role in connecting different components of the sewage discharge pipeline system, compensating for movements caused by environmental factors. The expansion joints’ seamless integration into the treatment process ensures stability and longevity, meeting the stringent environmental standards set for wastewater treatment facilities.

The authentic photo of songjiang pipeline expansion joints for Nanchang Jiulong Lake Treatment Plant

Below is a scanned copy of the authentic contract. Please do not modify or reproduce it. This contract serves as proof of supply. Thank you for your cooperation.

Collaborative Achievements and Future Prospects:

The collaboration between Nanchang Jiulong Lake Wastewater Treatment Plant and Songjiang Shock Absorber Co., Ltd. has yielded positive results, enhancing the adaptability and efficiency of the sewage discharge system. As this partnership progresses, it paves the way for a future where innovative solutions like Songjiang Pipeline Expansion Joints continue to play a crucial role in shaping sustainable wastewater management practices.

Related links:[ANSI] Flange Pipeline Expansion Joint Price List

If the original article is reprinted, please indicate the link of this article:https://www.pipeline-expansion-joint.com/advancing-wastewater-infrastructure-songjiang-pipeline-expansion-joints-at-nanchang-jiulong-lake-treatment-plant.html

Recommended products

Recommended cases

Recommended articles