Welcome to Pipeline Expansion Joint Manufacturer- Shanghai Songjiang Group Website |    Call Now:++86 13032112360    sales@songjiangflex.com

Application case of pipeline expansion joint in Guangzhou Metro Line 6 Project

 Project Cases     |      2022-08-26

Application case of pipeline expansion joint in Guangzhou Metro Line 6 Project

Shanghai Songjiang Shock Absorber Group Co., Ltd. won the bid for the Guangzhou Metro Line 6 Bid 1 Subway Project in November 2015. This project uses Shanghai Songjiang pipeline expansion joint products. The following is the purchase of Shanghai Songjiang Group for the Guangzhou Metro Line 6 Bid 1 project. Songjiang pipeline expansion joint Contract.

Introduction to Guangzhou Metro Line 6 Project

The starting point of Line 6 is Xunfenggang in the Jinshazhou area in the west of Guangzhou. It crosses the Beihuan Expressway and then goes southeast along the center of Jinshazhou Road. It crosses the tributary of the Pearl River with the Baisha River Bridge on the east side of Shafeng Village. Connect to the top of Sands of Datansa. After that, the line turns to the south, from the viaduct to the underground tunnel, and goes south to Tanwei Station on the side of Shuangqiao Road and transfers to Line 5. After the line passes through the Guangmao Railway, it crosses the tributary of the Pearl River obliquely, and Ruyifang Station is located at Duobao Road within the Dadichong area of the old Guangzhou South Station. The line goes south along Huangsha Avenue to Huangsha Station at Datong Road, and transfers to Line 1. Afterwards, the line follows Liu23 Road, passes through Cultural Park, Renmin South Road, and arrives at Haizhu Square along Yide Road and transfers to Line 2. After bypassing the Guangzhou Liberation Monument, pass Taikang Road, Wanfu Road, Yuexiu South Road in turn, pass through a large building near Donghua South Road and Dashatou Road, and arrive at Donghu Station.

The tunnel passes through Dongshan Lake and turns to the northeast, along Dongshan Street, Guigang Avenue, Shuqian Road, and transfers again with Line 1 at Dongshankou Station. Then the line turns north along Nonglinxia Road, and transfers again at Quzhuang Station with Line 5. After that, the line turns into Xianlie Middle Road with a small radius curve, then turns into Guangzhou Avenue North and Xinghua Road, and transfers with the branch line of Line 3 at Yantang Station. The line goes northeast along Yanling Road, transfers to Line 3 at Tianhe Bus Terminal, and finally arrives at Changjian Station along Tianyuan Road.

 

Contract introduction of pipeline expansion joint in Guangzhou Metro Line 6 Project

Pipeline expansion joint in Guangzhou Metro Line 6 Project

Performance characteristics of pipeline expansion joint:

  1. Small size, light weight, good elasticity, convenient installation and maintenance
  2. It can produce lateral, axial and angular displacement during installation, which is not limited by the lack of center of the pipeline and the non parallelism of the flange
  3. When working, it can reduce the noise transmitted by the structure and has strong vibration absorption ability

Related links: Single Sphere Pipeline Expansion Joint

If the original article is reprinted, please indicate the link of this article:https://www.pipeline-expansion-joint.com/application-case-of-pipeline-expansion-joint-in-guangzhou-metro-line-6-project.html

Recommended products

Recommended cases

Recommended articles