Shanghai Songjiang Company introduces to you the contract information for the installation of concentric reducer pipeline rubber expansion joint in the Chengde converter station project. Songjiang Group provides rubber expansion joints for many real estate power projects, with a 3-year warranty. The products are maintenance-free during use, have good vibration isolation effects, and reduce project usage costs.Introduction to the installation case of concentric reducing rubber expansion joint at Chengde Converter Station.Introduction to the Installation Case of Concentric Reducing Rubber Expansion Joint at Chengde Converter Station. After installation, the vibration isolation effect is very good.

Introduction to the Fengning Converter Station Project in Chengde City:

The Fengning Converter Station 500 kV Line Project has a total length of approximately 52.318 kilometers, with an altitude of 1000-1500 meters. 110 new basic iron towers, 34 tension towers, and 76 linear towers will be built. Fengning Pumped Storage Power Station is the largest pumped storage power station in China with the largest installed capacity. It is a key supporting green energy project for the 2022 Winter Olympics, with a total installed capacity of 3.6 million kilowatts, known as the “super power bank”. Super Power Bank “has two reservoirs, upper and lower, with a drop of 425 meters. A hydropower station that utilizes the electricity generated during the low load period to pump water to the upper reservoir and then releases water to the lower reservoir for power generation during the peak load period. This converts the excess electricity generated during the low load period of the power grid into high-value electricity during the peak load period of the power grid, and is also suitable for frequency modulation and phase modulation to stabilize the cycle and voltage of the power system. When the project is completed and put into operation, it will provide guarantee for the power transmission of the Zhangbei soft and straight project, play a very important role in realizing the “Green Winter Olympics”, and also provide strong support for improving the peak shaving capacity of the Beijing Tianjin and North Hebei power grids, ensuring the green power demand of the Beijing load center, achieving the goal of “carbon peak, carbon neutrality” and building a new power system.

Actual photo of installation case of concentric reducing rubber expansion joint at Chengde Converter Station:

Contract information for installation case of concentric reducing rubber expansion joint at Chengde Converter Station:

Related links:[Concentric Reducer] Pipeline Expansion Joint Product Solutions

If the original article is reprinted, please indicate the link of this article:https://www.pipeline-expansion-joint.com/introduction-to-the-installation-case-of-concentric-reducing-rubber-expansion-joint-at-chengde-converter-station.html

Recommended products

Recommended cases

Recommended articles