Welcome to Pipeline Expansion Joint Manufacturer- Shanghai Songjiang Group Website |    Call Now:++86 13032112360    sales@songjiangflex.com

[Xingyang Longcheng Experimental School Project] EPDM pipeline expansion joint Contract

 Project Cases     |      2024-06-11

Shanghai Songjiang Group company website introduces to you: [Xingyang Longcheng Experimental School Project] EPDM pipeline expansion joint contract information, Songjiang Group provides shock absorber products for many schools, the following is the supply of water pump rubber bellow connector for Xingyang Longcheng Experimental School.

The Longcheng Experimental School project is located in Xingyang, the famous historical place of the “Chu-Han War”, with a total construction area of about 190,000 square meters. Among them, the school is about 60,000 square meters, using a frame structure; the Haokun Court residential project is about 130,000 square meters, using a high-rise shear wall structure. The project started in July 2018 with a total construction period of 3 years.

[Xingyang Longcheng Experimental School Project] EPDM pipeline expansion joint Contract

The following is a scanned copy of the authenticity contract as a proof of supply, please do not modify it.  thank you for your cooperation!

[Xingyang Longcheng Experimental School Project] EPDM pipeline expansion joints Photo.

 

Related Links: [EPDM] Pipeline Expansion Joints“Ageing Resistance”

If the original article is reprinted, please indicate the link of this article:https://www.pipeline-expansion-joint.com/xingyang-longcheng-experimental-school-project-epdm-pipeline-expansion-joint-contract.html

Recommended products

Recommended cases

Recommended articles